PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bolting Derrick -3 Facing North-East (800x600).jpg Compacted area where the underground conduit is located for the temporary power Facing South-West  (800x600).jpg Conduit for the temporary power Facing South  (800x600).jpg Excavation at room 173 for the underground roughing Facing South-East (800x600).jpg Installing wall forms along column line 6.5 (G-D) Facing South-West (800x600).jpg